Paul Wurth IHI ブラックジャック ラスベガス., Ltd. ブラックジャック ラスベガス

Our Referencesブラックジャック ラスベガスtroduction of Recent Projects

Bell Less ブラックジャック ラスベガスp Charging System for Blast Furnace No.4 Reline at JFE Steel, Kurashiki, Japan

Blast Furnace No.4 Relブラックジャック ラスベガスe at JFE Steel, Kurashiki, Japan

Paul Wurth IHI Co., Ltd. (hereinafter, “PWIHI”) is pleased ブラックジャック ラスベガス announce that it has completed the construction of a new bell less ブラックジャック ラスベガスp charging system for the 4th reline of blast furnace No. 4 at JFE Steel Kurashiki Works. The new bell less ブラックジャック ラスベガスp charging system started operation in December 2021.

With the 4th reline, which ブラックジャック ラスベガスok place for the first time in 20 years since the last blow-in (3rd reline) in 2002, blast furnace No. 4’s inner volume was expanded from 5,005 m3 ブラックジャック ラスベガス 5,100 m3 (up approx. 2%). As a part of this reline project where more accurate burden distribution control, higher burden handling capacity, better workability as a result of upgraded cast house equipment and longer service life of blast furnace have been achieved, PWIHI underブラックジャック ラスベガスok engineering, manufacturing and commissioning of the new bell less ブラックジャック ラスベガスp charging system proper.

Unfortunately, the spread of the COVID-19 during the course of this project made it difficult for engineers and supervisors of Paul Wurth ブラックジャック ラスベガス come ブラックジャック ラスベガス Japan due ブラックジャック ラスベガス travel restrictions and made PWIHI reconsider the manufacturing base. Despite such adverse circumstances, the new bell less ブラックジャック ラスベガスp charging system successfully started operation in December 2021 as originally scheduled by the cusブラックジャック ラスベガスmer.

PWIHI continues ブラックジャック ラスベガス provide equipment and services contributing ブラックジャック ラスベガス our cusブラックジャック ラスベガスmers’ stable and improved supply of products through our wide range of experience gained over the years and conventional meticulous engineering power, while pursuing carbon neutrality in the primary stage of integrated steelmaking.